Why Atlanta Data Centers Need an Arc Flash Study Before Their Next Power Expansion

Short Answer: Yes. Any Atlanta data center needs its arc flash study updated before the new equipment is energized. New transformers, switchgear, and utility service change the available fault current and incident energy at every connected point, which makes existing arc flash labels and PPE requirements inaccurate. NFPA 70E sets two separate obligations: the study […]