Quick Answer: An arc flash study company should be judged on four things: a licensed Professional Engineer in responsible charge of the study, field data collected on site rather than taken from old drawings, calculations performed to IEEE 1584-2018 in recognized power system software, and a complete set of deliverables that includes the short-circuit, coordination and incident energy results, an updated one-line diagram, NFPA 70E-compliant labels and a written report. Bowtie Engineering delivers arc flash studies to that standard for industrial, commercial and data center facilities across the United States. Call 866-730-6620 to request a scope and quote.
Searching for an arc flash study company returns dozens of firms that all promise compliance. The differences that matter are not visible on a homepage: who signs the study, how the data is gathered, what method is used and what you receive at the end. Those differences decide whether the labels on your equipment are accurate, whether an inspector or insurer accepts the study and whether your workers are wearing the right PPE. This guide sets out the selection criteria in the order they affect the result, with the questions to ask each company you shortlist.
Arc Flash Study Basics: What You Are Actually Buying
An arc flash study, also called an incident energy analysis, calculates the thermal energy a worker could be exposed to at each piece of electrical equipment if an arcing fault occurred, and the distance at which that energy falls to 1.2 cal/cm². NFPA 70E 130.5 requires an arc flash risk assessment, and 130.5(G) describes the incident energy analysis method that most industrial facilities use. The study depends on two other studies: a short-circuit study that determines available fault current at each point, and a protective device coordination study that determines how fast each breaker or fuse clears a fault. All three are engineering calculations that use the IEEE 1584-2018 method, and the quality of the inputs decides the quality of the labels.
Licensing and Engineering Oversight
Ask which licensed Professional Engineer will take responsible charge of your study and in which state they are licensed. Power system studies are engineering work, and offering engineering services to the public is regulated by state licensing boards. A PE in responsible charge reviews the system model, the assumptions, the utility data and the results, and is professionally accountable for them. If the company cannot name the engineer, or the study will be produced by a technician with no engineering review, treat that as a disqualifier.
Also ask whether the company is independent of the equipment it is studying. A firm that also sells or installs switchgear has an interest in the mitigation it recommends. Bowtie Engineering’s arc flash studies are led by licensed Professional Engineers and performed to IEEE 1584, NFPA 70E and OSHA 1910.
Field Data Collection: The Step That Separates Real Studies From Desk Studies
The most common cause of a wrong arc flash label is bad input data, not bad math. A credible company sends qualified field staff to collect and verify:
- Every protective device: manufacturer, model, frame and trip unit, and the actual settings as found in the field.
- Conductor sizes, lengths and types for each feeder, because impedance changes fault current and incident energy.
- Transformer nameplate data including kVA, impedance and connection.
- Motor loads large enough to contribute to fault current.
- Equipment type, enclosure size and bus gap, which IEEE 1584-2018 uses directly.
- Utility available fault current and protective device data at the service, obtained from the utility in writing.
Ask the company how much of this they verify on site and how much they take from drawings. A study built from a ten-year-old one-line without field verification is a desk study, and its labels inherit every change made to the system since the drawing was issued.
Calculation Method and Software
The recognized method for AC systems is IEEE 1584-2018, which replaced the 2002 edition and changed the model to account for electrode configuration and enclosure size. Ask the company to confirm it uses the 2018 method and which software package it models in. Recognized packages include SKM PowerTools, ETAP and EasyPower; each is acceptable in the hands of an engineer who understands the inputs. Ask how the company handles DC systems, which IEEE 1584 does not cover, and systems below the IEEE 1584 voltage and current ranges.
Ask also how the company treats the clearing time assumption. The 2027 edition of NFPA 70E notes in Table 130.7(C)(15)(a) that listed clearing times assume the fault current falls within the device’s instantaneous trip region; a study should check that assumption at each bus rather than assume it.
Deliverables an Arc Flash Study Company Should Provide
A complete study produces the following, and each item should be named in the proposal:
- Short-circuit study results showing available fault current at every bus and confirming equipment interrupting ratings are adequate.
- Protective device coordination study with time-current curves and recommended settings.
- Incident energy analysis results for every piece of equipment studied: incident energy at the working distance, arc flash boundary and the PPE the result requires.
- Arc flash labels that meet NFPA 70E 130.5(H): nominal system voltage, arc flash boundary and at least one of the available incident energy and working distance, the PPE category, the minimum arc rating, or the site-specific level of PPE; good practice adds the date of the analysis.
- An updated one-line diagram reflecting the system as found.
- A written report describing the method, assumptions, data sources, results and recommended mitigation, with the PE’s review.
- Mitigation recommendations where incident energy is high, such as setting changes, maintenance mode switches or remote operation.
- Label installation and a walkthrough with your team, so workers understand what the labels mean.
Confirm that the deliverables are yours to keep in editable form. A study you cannot update because the model belongs to the vendor is a study you will pay for again.
Arc Flash Study Update Requirements
NFPA 70E 130.5 requires the arc flash risk assessment to be updated when a major modification or renovation takes place and reviewed for accuracy at intervals not to exceed five years. Ask how the company supports updates: whether it keeps your model, what it charges to incorporate a change and whether it can update a study another firm completed. Bowtie Engineering explains the process in who can update an arc flash study another firm completed. A company that ties updates to maintenance findings, such as breaker trip-time tests, is treating the study as a living document rather than a one-time deliverable.
Arc Flash Study Cost Factors
Pricing depends on the number of buses and protective devices, the size and age of the system, how much data must be collected in the field, the quality of existing drawings, the number of sites and whether labels are installed by the company. A proposal that quotes a price without asking those questions has not scoped your facility. Ask for a scope that lists the equipment to be studied so proposals can be compared like for like. As a reference point, Bowtie Engineering prices most arc flash studies between $9,000 and $14,000, quotes each study on its scope, and notes that large electrical systems can cost considerably more.
Selection Checklist: Questions to Ask Every Arc Flash Study Company
- Which licensed PE will take responsible charge, and in which state?
- What data will you verify in the field, and what will you take from drawings?
- Do you calculate to IEEE 1584-2018, in which software, and how do you handle DC and out-of-range systems?
- List every deliverable, and confirm the model and drawings are mine to keep.
- Do your labels meet NFPA 70E 130.5(H), and will you install them?
- How do you handle updates, and what triggers them?
- How many studies have you completed in facilities like mine, and can you provide references?
- Can you also provide the NFPA 70E training and maintenance testing that keep the study accurate?
The current edition of the standard and its label requirements are published on the NFPA 70E page. Bowtie Engineering has completed more than 900 electrical safety programs for data centers, manufacturing, industrial and commercial facilities, with work led by licensed Professional Engineers and Certified Energy Managers.
Frequently Asked Questions
What is the difference between an arc flash study and an arc flash risk assessment?
NFPA 70E 130.5 requires an arc flash risk assessment, which identifies hazards, estimates likelihood and severity and determines protective measures. The arc flash study, or incident energy analysis under 130.5(G), is the engineering calculation that supplies the severity numbers used in that assessment.
Does an arc flash study have to be stamped by a PE?
Requirements vary by state, but power system studies are engineering work regulated by state licensing boards, and the study should be prepared under the responsible charge of a licensed PE. Ask the company to name the engineer and confirm their license.
How often does an arc flash study need to be updated?
NFPA 70E 130.5 requires an update when a major modification or renovation occurs and a review for accuracy at intervals not to exceed five years. Changes to protective device settings, transformer replacements and utility changes are common triggers.
Can a facility do its own arc flash study?
A facility with a licensed electrical engineer, the software and the time to collect field data can. Most facilities find that an independent study company with a PE in responsible charge is faster, more defensible and less costly than building the capability in-house.
What should be on an arc flash label?
NFPA 70E 130.5(H) requires the nominal system voltage, the arc flash boundary and at least one of: available incident energy and working distance, the PPE category, the minimum arc rating of clothing, or the site-specific level of PPE. Adding the date of the analysis is good practice.
Key Takeaways
- Judge an arc flash study company on PE oversight, field data collection, IEEE 1584-2018 method and complete deliverables.
- Bad input data, not bad math, causes most wrong labels; insist on field verification of devices, settings and conductors.
- Deliverables must include short-circuit, coordination and incident energy results, an updated one-line, NFPA 70E 130.5(H) labels and a written report.
- NFPA 70E 130.5 requires updates after major modifications and a review at least every five years.
- Ask for a defined scope before comparing prices, and keep the model and drawings in editable form.
- Bowtie Engineering performs PE-led arc flash studies across the United States; request a scope and quote.